The Well Driller arrives on site.

 

Excavating for Driller to handle well residue.

 

Laying Ground Loop Piping from wells to house.

 

Loop holes cored into foundation wall.

 

Hydro-seeding well area after backfill.

 

Geothermal heat pump install with flow station.

 

Geothermal Well Piping manifold.

 

 

Setting the rig for well drilling.

 

Containment of water & backfill of well head.

 

Mixing & injecting Thermal Grout into wells.

 

Completed & backfilled well head with loop.

 

Re-seeded lawn area after well installation.

 

Geothermal preheat for hot water.

 

Typical Geothermal heat pump installation.

 


All Rights Reserved - Ramhart Construction Inc. 2005 - Commercial | Residential | Industrial | Contact | Referrals | About